Mr Christmas Christmas Lights Show Croxley Green

Mr Christmas`s fundraising lights Lancing Way Croxley Green



Abbeymead Building Ltd  Charted Building Company (CBC), have supported Dave and Carol Edwards in their Christmas Fund Raising activities for a number of years.

Dave and Carol have been decorating their house for the past 36 years to raise money for Local Charities and as old age has set in it has been increasing difficult for them to erect the decorations.
Abbeymead Building Ltd (CBC)  assist by erecting the decorations ,under  Daves watchful supervision, and then removing them in the New Year at the end of the festive period.
 Last year they raised over £6000.00 


This year they are raising money for-

The Brompton Fountain

 

Come along & join in the fun 


  







 










The lights will be switched on the 19th of November at 6.00pm 
With Heart FM @thisisheart providing a DJ and Live support 

We call upon you to help this year be another success for Carol, Dave and the Brompton Fountain

The road will be closed with the traditional street party that ensues into the evening More information at Mr Christmas  Facebook Page

More about the Brompton Fountain

Heart Watford/Hemel

Case Study Commercial Office refurbishment London



Abbeymead Building ltd, A Chartered Building Company( CBC) ,were contracted to carry out the refurbishment of the Headquarters of a prestigious London design agency in an Iconic Building located in the West End.



The building had won many design awards during construction and the refurbishment was to be sympathetic to original design intent.

Works consisted of New Electrical and Data installation, Air Conditioning installation, new raised access flooring and carpets, breakout kitchens to each floor, refurbished public areas and escape routes, Restaurant refurbishment and Decorations to the entire building including new office furniture.



The refurbishment works were to be carried out in a live environment, in phases ,with the works rotating around the floors as the occupant were moved from different zones allowing the works to be completed on a 3 week phase period per zone.



The works involved a high level of Planning and safety was paramount as the buildings occupants, which at times approach 600 people, had to be able to work in a safe dust free environment.

The existing Lift used for Vertical transportation and deliveries and removals had to be carefully scheduled

Being a member of RoSPA Abbeymead undertook the role of Principle Contractor  and directed the clients in house safety team and domestic sub-contractors.

  A Permit to work system (PTW) was strictly enforced



The project also involved a number of high level access requirements and innovative

Solutions were required.

Abbeymead team were trained to use super lightweight cherry pickers to access the 6 storey atrium roof to enable cleaning and decoration works to be undertaken.Further works were undertaken by specialist abseil teams

Refurbishment works to critical areas were carried out either out of hours or during strictly controlled shutdown periods were noisy works were contained to avoid disturbance

The works were completed during a 48 week period with zero accidents 

For more information about Abbeymead Building